Equipment

Mr. Jimmy’s Sissy Bar.

A custom Old Skool sissy bar built for Mr. Jimmy to put on his Softail.

 

Mr.-Jimmy's-Sissy-Bar-2

Advertisements
Categories: Equipment, Projects | Tags: , | Leave a comment

New oil tank/battery box.

Going to the cleaner look of a wrap around oil tank/battery box.

 

2014-07-18 12.34.21 2014-07-18 12.34.38

Old-Oil-Tank-1   Old-battery-box-1

Categories: Equipment, Projects | Tags: , | Leave a comment

Trans buttoned up ready to install.

My transmission is ready to go.

2014-07-16 12.12.56

Categories: Equipment, Projects | Tags: , | Leave a comment

Upgrade (my opinion) of the Throwout Bearing in a 4 speed.

I bought a kit to change the throwout bearing in my transmission. I like the older bearing better than the new one. I have changed a few of these, but this is the first time I needed to change the kicker clutch. The new clutch is smaller and designed to fit snuggly inside the bearing. The newer style is on the right and the upgrade to the older one with the kicker clutch is on the left. Also changed the pushrod as they are different.

2014-07-16 10.54.30

Categories: Equipment, Projects | Tags: , | Leave a comment

New Tool Box

I got a new tool box today. 

Doug likes it.

toolbox-1

But….

I think I might need a step to use the top. 🙂

toolbox-2

Categories: Equipment | Tags: | Leave a comment

Create a free website or blog at WordPress.com.

%d bloggers like this: